Objective: 1) to look for the final project title
2) modified the project so much better than its predecessor
Content : Discussion with project supervisor regarding project title.
:This project dramatically improved further with him for LCD function detected when there is fire where we known the level which mold be burned.
: Discussion with project supervisor about block diagram.
: Doing same comparison with previous final project.
:Study the flow of the system from previous project.
This block diagram
LCD : function the LCD is to notify in the event of a fire in a building that has a high level.
Buzzer : function for buzzer is telling a fire, the buzzer will sound.
LED : Function for LED is flashing when the lights of fire.
No comments:
Post a Comment